I don't think you can set a loop at the end and include the DC bars at the start.
That said, it would be easy to Edit>Duplicate select the bars at the start, Copy. Paste them at the end (or after the DC instruction) Save, and then set your practice loop. When done, delete the chart.
)BOB
Bookmarks